![]() |
![]() |
![]() |
![]() |
||||||||
|
|
|
|
|
||||||||
|
225TH Street
(East Beltway)
Client:
City of Council Bluffs, IA
HGM Contact:
tsmith@hgmonline.com
HGM held public meetings and initiated ROW
acquisition. This
urban roadway was designed with a new alignment.
Work included 300,000 cubic yards earthwork (Loess
Soils), 35,000 square yards of paving, extensive erosion
control, storm sewer system, letdown structures, diversion berms
and special matting and seeding.
architectural
| engineering | surveying
|
||||||||||